Polyurea Injection Grout

44

Single-component / Eco friendly / OEM Accepted

had83e9cec4e74c6abfeba0e30d353968d 拷贝
Polyurea grout injection bucket for concrete crack waterproofing
h05ec872b8ae648f59eafc09f5c75b068j 拷贝
h131570496eb84346b7dc6c8739008280c 拷贝

1.Civil Engineering: Polyurea sealant is used in water conservancy projects such as dam reinforcement and seepage prevention, enhancing safety

2.Subway Tunnels: In tunnel construction, polyurea grouting fills gaps between tunnel linings and surrounding rocks, preventing water leakage and ensuring safety

3.Bridge Repair: Polyurea sealant, with its fast curing and high strength, is ideal for repairing bridge cracks and restoring load-bearing capacity

4.Industrial and Civil Buildings: Polyurea sealant is used for waterproofing in basements, roofs, and walls, protecting the building structure.

Specification:9kg/pail or 20kg/pail
Appearance:Single component, gray viscous liquid.
Shelf Life:1 Year
ItemData
Solid content, %98
Surface dry time, h3
Full Drying time, h7
Tensile strength, MPa1.3
Elongation at break, %402
Waterproofness0.3MPa, 120min, waterproof
Heating shrinkage rate, %-1.9

ADVANTAGES

Exceptional Durability:

Esistant to water immersion, acid
and alkali, and high temperatures.

Underwater Curing

Capability: Can fully cure in water,tightly bonding with concrete even in humid or submerged
conditions.

Strength and Elasticity Balance:

Possesses certain
strength and elasticity, reinforcing structures while
accommodating deformation.

Dense Structure and Waterproof Performance:

Dense internal structure, outstanding waterproof performance.

Customization is available for product color, packaging design, and package sizes.

First Name
Last Name
Email
Message
The form has been submitted successfully!
There has been some error while submitting the form. Please verify all form fields again.

Contact us

Address

Building 12, Yun Chao Fu, Hangzhou City, Zhejiang Province, china.

Phone

+86 15231151892
+86 15906641341

EMAIL

info@boslaiwaterproof.com

Note:

1.For filling joints or pavement cracks, the product can be poured directly into the crack.

2.During application, the substrate temperature must be at least 3°C above the dew point.

3.When injecting the product with a grouting machine, a polyurea-specific injection machine or a machine with a power rating of 1500W or higher must be used. Otherwise, the product may not be properly dispensed.

4.When working in confined spaces, ensure adequate ventilation is maintained.

5.Once the pail is opened, it is recommended to use it up within 3 to 5 days, provided the lid is tightly resealed. Otherwise, the product will cure upon exposure to air.